Bunbury Youth Precinct

Bunbury Youth Precinct

Client:
City of Bunbury
Construction Period:
September 2021 – June 2022
Total Value:
$6,760,720 + GST

This project at Luciana Park, Bunbury, involved constructing a youth precinct, mirroring the Sienna Wood project. We:

The project involved:

  • Liaising with all key stakeholders to reduce the Project’s impact on the daily operations of the community.
  • Decorative Concrete Paths ~4000m2 pram ramps and garden kerbs.
  • Installation of drainage including subsoil infiltration trenches, ACO Strip Drains, pump station, PVC pipe and grates throughout the skatepark and paved areas.
  • Earthworks and final trimming to design levels (bulk earthwork was by others).
  • Installation of irrigation systems for turf areas and surrounding garden beds.
  • Soil preparation for turf and plantings.
  • Installation of ~5,000m2 of turf;
  • Hydroseeding to ~3500m2.
  • Planting of over 1300No. 140mm pots, including watering and fertilising.
  • Planting of over 70No. trees ranging from 100L to 500L including watering and fertiliser.
  • 13-Week Consolidation Period.
  • Mulching of landscaped areas.
  • Installation of a variety of playground soft fall treatments, including rubber soft fall and sand soft fall.
  • Construction of ~3000m2 of skatepark area including bowls, quarter pipes, plaza area, rails, stairs, snake run, ledges, etc.
  • Installation of balustrade and handrail to seawall edge, skatepark areas and stairs.
  • Installation of decorative and floodlighting.
  • A Youth Precinct building includes a community area, public toilets, kitchen and storage.
  • Installation of new park furniture, including but not limited to, picnic tables, bench seats, tables, bike racks, drinking fountains, bollards, disability access barbeques and waste bins.
  • Installation of a custom climbing net structure.