The Ballajura Intergenerational Playspace (Weitj Park) project was a resounding success, showcasing our expertise in bulk earthworks, drainage installation, and high-quality finishes across various construction elements. From the seamless installation of the 1200m³ drainage cell to the detailed craftsmanship of concrete pavements and playground equipment, each phase of the project was executed efficiently and to a high standard. Effective coordination between subcontractors, strategic problem-solving, and cost-saving measures played a key role in delivering an outstanding outcome for the City of Swan while maintaining budget and timeline constraints.
The Project Included:
- Clearing and bulk earthworks.
- Construction of a 1200m3 subsurface drainage cell.
- Construction of overflow water retention basins, complete with retaining walls.
- Concrete pavements with coloured, exposed aggregate and timber stamped finishes.
- Installation of new hydraulic services for water play areas, drink fountains and toilet block.
- Installation of new electrical services for park/ street lighting and park barbecues.
- Installation of CCTV throughout the entire park including construction of a security server room.
- Construction of a toilet block and sewer pup station including connection to existing sewer.
- Parking facilities in both asphalt and brick paving finishes.
- Design and fabrication of bespoke art pieces.
- Supply and installation of over thirty separate pieces of paly equipment separated over six separate play areas.
- Playground fencing and gates around the entire park.
- Supply and installation of a custom nine-metre-tall centre piece play tower.
- Softfall mulch and rubber to all play areas.
- Installation of shade sails.
- Shade shelters, picnic tables, bench seating, drink fountains and bike racks.
This project exemplified our ability to deliver complex civil works with precision and efficiency. The collaboration between contractors, innovative construction techniques, and strategic cost-saving measures contributed to the project's overall success. The finished playspace is a testament to our commitment to quality, functionality, and sustainability, providing a vibrant, long-lasting community asset.