Our projects

Mandurah Estuary Pool Seawall

Written by Asha | Jul 17, 2025 3:36:45 AM

The Mandurah Estuary Pool project included the construction of reinforced concrete retaining walls, reclamation, terraces, stairs, an access ramp, and beaches on the Mandurah Eastern Foreshore. 

The Project Included: 

  • Demolishing the existing rock groyne and limestone wall.
  • Improving the ground through surcharging.
  • Excavation and earthwork.
  • Dewatering with appropriate protection and management.
  • Installing reinforced concrete retaining walls with subsoil drainage and backfill compaction.
  • Installing Geotextile Sand Containers (GSC) for scour protection.
  • Creating terraces, stairs, and access ramps for promenade-to-water access.

The project was completed on time and within budget, with no environmental incidents.